Scheduling tasks on moving executors to minimise the maximum lateness
From MaRDI portal
Publication:5937357
DOI10.1016/S0377-2217(00)00058-8zbMath0978.90046MaRDI QIDQ5937357
Publication date: 16 January 2002
Published in: European Journal of Operational Research (Search for Journal in Brave)
Deterministic scheduling theory in operations research (90B35) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20)
Related Items (1)
Cites Work
- Unnamed Item
- A two-commodity flow formulation for the traveling salesman and the makespan problems with time windows
- Scheduling with Multiple Performance Measures: The One-Machine Case
- State-space relaxation procedures for the computation of bounds to routing problems
- Dynamic Programming Strategies for the Traveling Salesman Problem with Time Window and Precedence Constraints
- An Optimal Algorithm for the Traveling Salesman Problem with Time Windows
This page was built for publication: Scheduling tasks on moving executors to minimise the maximum lateness