Resource-constrained project scheduling: A heuristic for the multi-mode case
From MaRDI portal
Publication:5945227
DOI10.1007/PL00013354zbMath0985.90037OpenAlexW2024009720MaRDI QIDQ5945227
Publication date: 10 October 2001
Published in: OR Spektrum (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/pl00013354
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (13)
Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting ⋮ Modelling and solving generalised operational surgery scheduling problems ⋮ Project scheduling with finite or infinite number of activity processing modes -- a survey ⋮ Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem ⋮ Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting ⋮ Time and work generalised precedence relationships in project scheduling with pre-emption: an application to the management of service centres ⋮ Considering project management activities for engineering design groups ⋮ A practical and robust execution time-frame procedure for the multi-mode resource-constrained project scheduling problem with minimal and maximal time lags ⋮ Skilled workforce scheduling in service centres ⋮ Scheduling tests in automotive R\&D projects ⋮ A double genetic algorithm for the MRCPSP/max ⋮ A survey of variants and extensions of the resource-constrained project scheduling problem ⋮ A modified modeling approach and a heuristic procedure for the multi-mode resource constrained project scheduling problem with activity splitting
Uses Software