Fuzzy flexible flow shops at two machine centers for continuous fuzzy domains
From MaRDI portal
Publication:5946289
DOI10.1016/S0020-0255(00)00066-9zbMath0996.90043OpenAlexW1982701228MaRDI QIDQ5946289
Publication date: 14 October 2001
Published in: Information Sciences (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0020-0255(00)00066-9
Deterministic scheduling theory in operations research (90B35) Fuzzy and other nonstochastic uncertainty mathematical programming (90C70)
Related Items (7)
Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective ⋮ A hybrid multi-objective immune algorithm for a flow shop scheduling problem with bi-objectives: weighted mean completion time and weighted mean tardiness ⋮ An improved migrating birds optimisation for a hybrid flowshop scheduling with total flowtime minimisation ⋮ A cooperative co-evolutionary particle swarm optimiser based on a niche sharing scheme for the flow shop scheduling problem under uncertainty ⋮ The hybrid flow shop scheduling problem ⋮ A class of multi-objective expected value decision-making model with birandom coefficients and its application to flow shop scheduling problem ⋮ Survey on fuzzy shop scheduling
Cites Work
- Unnamed Item
- Scheduling algorithms for flexible flowshops: Worst and average case performance
- The multiple judge, multiple criteria ranking problem: A fuzzy set approach
- A study of the ranking function approach through mean values
- Ranking alternatives using fuzzy numbers
- A procedure for ranking fuzzy numbers using fuzzy relations
- A subjective approach for ranking fuzzy numbers
- A fast method of ranking alternatives using fuzzy numbers
- A procedure for ordering fuzzy subsets of the unit interval
This page was built for publication: Fuzzy flexible flow shops at two machine centers for continuous fuzzy domains