Makespan minimization for flow-shop problems with transportation times and a single robot

From MaRDI portal
Publication:5946823

DOI10.1016/S0166-218X(00)00316-4zbMath0990.90041MaRDI QIDQ5946823

Sigrid Knust, Johann L. Hurink

Publication date: 16 October 2001

Published in: Discrete Applied Mathematics (Search for Journal in Brave)




Related Items (29)

Machine scheduling with job delivery coordinationTwo-machine flowshop scheduling problems involving a batching machine with transportation or deterioration considerationA scheduling problem in blocking hybrid flow shop robotic cells with multiple robotsScheduling in reentrant robotic cells: algorithms and complexityTwo machine scheduling under disruptions with transportation considerationsComplexity of problem \(TF2|v=1,c=2|C_{\max}\)Flowshop scheduling with interstage job transportationScheduling multi-staged jobs on parallel identical machines and a central server with sequence-dependent setup times: an application to an automated kitchenCoordinating multi-location production and customer deliveryFlow shop scheduling problems with transportation constraints revisitedFlow shop scheduling problems with transportation constraints revisitedPreemptive scheduling on two identical parallel machines with a single transporterA two-stage flow shop scheduling problem with transportation considerationsAn improved approximation algorithm for a scheduling problem with transporter coordinationNew complexity results on scheduling problem in a robotic cellComplexity results for an integrated single machine scheduling and outbound delivery problem with fixed sequenceFlowshop problem \(F2 \to D|v=1\), \(c\geq 1|C_{\max}\) revisitedMultiplicity and complexity issues in contemporary production schedulingRobotic cell scheduling with operational flexibilityTabu search algorithms for job-shop problems with a single transport robotOptimization of processing and delivery decisions involving third-party machinesCoordination of production and transportation in supply chain schedulingOptimal robot scheduling to minimize the makespan in a three-machine flow-shop environment with job-independent processing timesTransporting jobs through a two‐machine open shopAn optimization-based heuristic for the robotic cell problemA tight approximation algorithm for problem \(P2\rightarrow D|v=1,c=1|C_{\max }\)A framework for the complexity of high-multiplicity scheduling problemsPreemptive scheduling on identical machines with delivery coordination to minimize the maximum delivery completion timeOn scheduling cycle shops: Classification, complexity and approximation



Cites Work


This page was built for publication: Makespan minimization for flow-shop problems with transportation times and a single robot