Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Four payment models for the multi-mode resource constrained project scheduling problem with discounted cash flows - MaRDI portal

Four payment models for the multi-mode resource constrained project scheduling problem with discounted cash flows

From MaRDI portal
Publication:5948203

DOI10.1023/A:1010914417817zbMath0990.90509OpenAlexW2122612890MaRDI QIDQ5948203

Gündüz Ulusoy, Şule Önsel Şahin, Funda Sivrikaya-Serifoglu

Publication date: 31 October 2001

Published in: Annals of Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1023/a:1010914417817




Related Items (21)

Variable neighbourhood search and tabu search for a discrete time/cost trade-off problem to minimize the maximal cash flow gapA genetic algorithm for resource investment problem with discounted cash flowsKnowledge integration using problem spaces: A study in resource-constrained project schedulingScheduling multi-mode projects under uncertainty to optimize cash flows: a Monte Carlo ant colony system approachProject scheduling with finite or infinite number of activity processing modes -- a surveyInformation advantage and payment disadvantage when selling goods through a powerful retailerAn applicable method for modifying over-allocated multi-mode resource constraint schedules in the presence of preemptive resourcesA lexicographic approach to the robust resource-constrained project scheduling problemMulti-objective multi-mode resource constrained project scheduling problem using Pareto-based algorithmsConsidering project management activities for engineering design groupsMetaheuristics for multi-mode capital-constrained project payment schedulingAn integer programming formulation for the project scheduling problem with irregular time-cost tradeoffsSimulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment modelsA survey of variants and extensions of the resource-constrained project scheduling problemClient‐contractor bargaining on net present value in project scheduling with limited resourcesProject selection, scheduling and resource allocation with time dependent returnsDiscrete-continuous project scheduling with discounted cash inflows and various payment models -- a review of recent resultsA parameter-tuned genetic algorithm for the resource investment problem with discounted cash flows and generalized precedence relationsA priority rule-based heuristic for resource investment project scheduling problem with discounted cash flows and tardiness penaltiesSimulated annealing and tabu search for multi-mode project payment schedulingEvolutionary algorithms applied to project scheduling problems—a survey of the state-of-the-art




This page was built for publication: Four payment models for the multi-mode resource constrained project scheduling problem with discounted cash flows