A fuzzy approach to construction project risk assessment and analysis: Construction project risk management system
From MaRDI portal
Publication:5950329
DOI10.1016/S0965-9978(01)00036-9zbMath0984.68535OpenAlexW2001493935MaRDI QIDQ5950329
Publication date: 14 May 2002
Published in: Advances in Engineering Software (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0965-9978(01)00036-9
Lua error in Module:PublicationMSCList at line 37: attempt to index local 'msc_result' (a nil value).
Related Items (9)
A GAME THEORETIC OPTIMIZATION MODEL BETWEEN PROJECT RISK SET AND MEASURE SET ⋮ MAXIMUM DRAWDOWN INSURANCE ⋮ STATIC HEDGING OF DEFAULTABLE CONTINGENT CLAIMS: A SIMPLE HEDGING SCHEME ACROSS EQUITY AND CREDIT MARKETS ⋮ PRICING OF THE AMERICAN PUT UNDER LÉVY PROCESSES ⋮ HEDGING EUROPEAN DERIVATIVES WITH THE POLYNOMIAL VARIANCE SWAP UNDER UNCERTAIN VOLATILITY ENVIRONMENTS ⋮ THE VARIANCE SWAP CONTRACT UNDER THE CEV PROCESS ⋮ MONOTONICITY IN THE VOLATILITY OF SINGLE-BARRIER OPTION PRICES ⋮ VOLATILITY DERIVATIVES IN MARKET MODELS WITH JUMPS ⋮ PROJECT RISK RANKING IN LARGE-SCALE PROGRAMS: A FUZZY SET BASED APPROACH
This page was built for publication: A fuzzy approach to construction project risk assessment and analysis: Construction project risk management system