The peak load minimization problem in cyclic production
From MaRDI portal
Publication:5955976
DOI10.1016/S0305-0548(00)00055-1zbMath1039.90510MaRDI QIDQ5955976
Publication date: 28 May 2002
Published in: Computers \& Operations Research (Search for Journal in Brave)
Related Items (4)
Optimum service capacity and demand management with price incentives ⋮ Unnamed Item ⋮ Solving the economic lot scheduling problem with multiple facilities in parallel using the time-varying lot sizes approach ⋮ Determination of replenishment dates for restricted-storage, static demand, cyclic replenishment schedule
Cites Work
- Scheduling Economic Lot Size Production Runs
- The G-group heuristic for single machine lot scheduling
- The Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot Sizes
- Two heuristics for the economic lot scheduling problem: An experimental study
- Computing Optimal Lot Sizes in the Economic Lot Scheduling Problem
- The Economic Lot Scheduling Problem (ELSP): Review and Extensions
- Comments on the Two-Product, Single-Machine, Static Demand, Infinite Horizon Lot Scheduling Problem
- Unnamed Item
- Unnamed Item