A disjunctive model for scheduling in a manufacturing and packing facility with intermediate storage
From MaRDI portal
Publication:5958052
DOI10.1023/A:1010095932721zbMath1004.90038MaRDI QIDQ5958052
Ignacio E. Grossmann, Vipul Jain
Publication date: 21 April 2002
Published in: Optimization and Engineering (Search for Journal in Brave)
Mixed integer programming (90C11) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (2)
Simultaneous optimization of production planning and inventory management of polyurethane foam plant ⋮ A hybrid method for large-scale short-term scheduling of make-and-pack production processes
This page was built for publication: A disjunctive model for scheduling in a manufacturing and packing facility with intermediate storage