A new graphical method to estimate the optimal repair-time limit with incomplete repair and discounting
From MaRDI portal
Publication:597347
DOI10.1016/S0898-1221(03)90114-3zbMath1045.62102OpenAlexW1989205733MaRDI QIDQ597347
Tadashi Dohi, Shunji Osaki, Naoto Kaio
Publication date: 6 August 2004
Published in: Computers \& Mathematics with Applications (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0898-1221(03)90114-3
Nonparametric estimation (62G05) Estimation in survival analysis and censored data (62N02) Reliability and life testing (62N05) Graphical methods in statistics (62A09)
Related Items (4)
Optimal replacement model with age-dependent failure type based on a cumulative repair-cost limit policy ⋮ Optimal age-replacement model with age-dependent type of failure and random lead time based on a cumulative repair-cost limit policy ⋮ Optimal age-replacement time with minimal repair based on cumulative repair cost limit and random lead time ⋮ DISCRETE REPAIR-COST LIMIT REPLACEMENT POLICIES WITH/WITHOUT IMPERFECT REPAIR
Cites Work
- Nonparametric repair-limit replacement policies with imperfect repair
- A graphical method to repair-cost limit replacement policies with imperfect repair.
- Optimal Repair Limit Replacement Policies with Imperfect Repair
- Optimum ordering policies with lead time for an operating unit
- A General Definition of the Lorenz Curve
This page was built for publication: A new graphical method to estimate the optimal repair-time limit with incomplete repair and discounting