One-Operator, Two-Machine Open Shop And Flow Shop Scheduling With Setup Times For Machines And Maximum Lateness Objective
From MaRDI portal
Publication:6039349
DOI10.1080/03155986.2003.11732683MaRDI QIDQ6039349
Mohammed Fazle Baki, Raymond G. Vickson
Publication date: 5 May 2023
Published in: INFOR: Information Systems and Operational Research (Search for Journal in Brave)
Related Items
Two-machine open shop problem with a single server and set-up time considerations ⋮ A survey of scheduling problems with setup times or costs ⋮ Flow shop scheduling to minimize the total completion time with a permanently present operator: Models and ant colony optimization metaheuristic