A branch-and-bound algorithm to minimise the sum of maximum earliness and tardiness in the single machine

From MaRDI portal
Publication:604766
Jump to:navigation, search

DOI10.1504/IJOR.2010.034069zbMath1198.90197OpenAlexW2002220688MaRDI QIDQ604766

Ghasem Moslehi, Majid Amin-Nayeri, Amir Azaron, Mehdi Mahnam

Publication date: 12 November 2010

Published in: International Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1504/ijor.2010.034069


zbMATH Keywords

earlinessbranch-and-boundtardinessjust-in-timesingle machine schedulingJIT production


Mathematics Subject Classification ID

Polyhedral combinatorics, branch-and-bound, branch-and-cut (90C57) Deterministic scheduling theory in operations research (90B35)


Related Items (1)

Single machine scheduling with unequal release times and idle insert for minimizing the sum of maximum earliness and tardiness







This page was built for publication: A branch-and-bound algorithm to minimise the sum of maximum earliness and tardiness in the single machine

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:604766&oldid=12494999"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
This page was last edited on 30 January 2024, at 07:51.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki