Parallel-Machine Scheduling with Step-Deteriorating Jobs to Minimize the Total (Weighted) Completion Time
From MaRDI portal
Publication:6053499
DOI10.1142/s0217595922400115zbMath1525.90214OpenAlexW4213245831WikidataQ113343362 ScholiaQ113343362MaRDI QIDQ6053499
Yujia Huo, Cuixia Miao, Ran Ma, Fanyu Kong, Juan Zou
Publication date: 19 October 2023
Published in: Asia-Pacific Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1142/s0217595922400115
Cites Work
- Unnamed Item
- Modeling the parallel machine scheduling problem with step deteriorating jobs
- Time-dependent scheduling
- Single machine scheduling with start time dependent processing times: Some solvable cases
- A concise survey of scheduling with time-dependent processing times
- Minimizing the total completion time in single-machine scheduling with step-deteriorating jobs
- Scheduling with step-deteriorating jobs to minimize the makespan
- A general variable neighborhood search for single-machine total tardiness scheduling problem with step-deteriorating jobs
- Batch scheduling with step-deteriorating processing times to minimize flowtime
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Single machine scheduling with step-deteriorating processing times
This page was built for publication: Parallel-Machine Scheduling with Step-Deteriorating Jobs to Minimize the Total (Weighted) Completion Time