An optimal construction of yield-based EWMA repetitive multivariate sampling plan
From MaRDI portal
Publication:6053879
DOI10.1080/03610926.2022.2050401OpenAlexW4221020900MaRDI QIDQ6053879
Adel Ahmadi Nadi, Robab Afshari
Publication date: 24 October 2023
Published in: Communications in Statistics - Theory and Methods (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/03610926.2022.2050401
principal component analysisexponentially weighted moving averageacceptance sampling planprocess yield indexrepetitive sampling plan
Related Items (1)
Cites Work
- Unnamed Item
- Multivariate statistical quality control using R.
- Optimal design of overall yield-based variable repetitive sampling plans for processes with multiple characteristics
- Multiple dependent state sampling plans for lot acceptance based on measurement data
- Developing a sampling plan by variables inspection for controlling lot fraction of defectives
- Measuring production yield for processes with multiple characteristics
- Measuring production yield for processes with multiple quality characteristics
- Repetitive group sampling procedure for variables inspection
- Multiple dependent state repetitive sampling plans based on one-sided process capability indices
- Determination of a new mixed variable lot-size multiple dependent state sampling plan based on the process capability index
- Brocess capability with asymmetric tolerances
- Design of variables sampling plans based on lifetime-performance index in presence of hybrid censoring scheme
- Designing variables sampling plans based on the yield index Spk
- Developing variables sampling plans based on EWMA yield index
- A new lot inspection procedure based on exponentially weighted moving average
This page was built for publication: An optimal construction of yield-based EWMA repetitive multivariate sampling plan