Bicriterion Pareto‐scheduling of equal‐length jobs on a single machine related to the total weighted late work
From MaRDI portal
Publication:6057022
DOI10.1002/nav.22103zbMath1525.90192MaRDI QIDQ6057022
Qiu-Lan Zhao, Cheng, T. C. Edwin, Jinjiang Yuan, Rubing Chen, C. T. Daniel Ng
Publication date: 25 October 2023
Published in: Naval Research Logistics (NRL) (Search for Journal in Brave)
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Single machine scheduling with two competing agents, arbitrary release dates and unit processing times
- Single machine scheduling with two competing agents and equal job processing times
- Temperature aware online algorithms for scheduling equal length jobs
- Two-agent scheduling on uniform parallel machines with min-max criteria
- Bicriterion scheduling with equal processing times on a batch processing machine
- Approximation algorithms for scheduling a single machine to minimize total late work
- A two-agent single-machine scheduling problem with late work criteria
- Scheduling on parallel identical machines with late work criterion: offline and online cases
- Two-agent scheduling on a single parallel-batching machine with equal processing time and non-identical job sizes
- Minimizing total completion time and maximum cost simultaneously is solvable in polynomial time
- A note on competing-agent Pareto-scheduling
- Two-agent preemptive Pareto-scheduling to minimize the number of tardy jobs and total late work
- Two-agent scheduling of unit processing time jobs to minimize total weighted completion time and total weighted number of tardy jobs
- Minimizing total late work on a single machine with generalized due-dates
- Mirror scheduling problems with early work and late work criteria
- Single-machine Pareto-scheduling with multiple weighting vectors for minimizing the total weighted late works
- Pareto-scheduling of two competing agents with their own equal processing times
- Minimizing total weighted late work on a single-machine with non-availability intervals
- Single-machine scheduling with multi-agents to minimize total weighted late work
- Single-machine scheduling with maintenance activities and rejection
- Two competitive agents to minimize the weighted total late work and the total completion time
- The complexity of CO-agent scheduling to minimize the total completion time and total number of tardy jobs
- Fully polynomial time approximation scheme to maximize early work on parallel machines with common due date
- Bicriteria scheduling of equal length jobs on uniform parallel machines
- Scheduling with release dates and preemption to minimize multiple max-form objective functions
- Scheduling a single machine with primary and secondary objectives
- Scheduling with or without precedence relations on a serial-batch machine to minimize makespan and maximum cost
- A note on a two-agent scheduling problem related to the total weighted late work
- Scheduling two agents on uniform parallel machines with~makespan and cost functions
- Pareto optimization of rescheduling with release dates to minimize makespan and total sequence disruption
- A multiple-criterion model for machine scheduling
- Multicriteria scheduling
- Scheduling with competing agents, total late work and job rejection
- Scheduling Problems with Two Competing Agents
- Single Machine Scheduling to Minimize Total Late Work
- One machine sequencing to minimize mean flow time with minimum number tardy
- On Finding the Maxima of a Set of Vectors
- A Fully Polynomial Approximation Scheme for Scheduling a Single Machine to Minimize Total Weighted Late Work
- A dual criteria sequencing problem with earliness and tardiness penalties
- Bicriteria scheduling on a single batching machine with job transportation and deterioration considerations
- Approximation schemes for single‐machine scheduling with a fixed maintenance activity to minimize the total amount of late work
- A note on efficient sequences with respect to total flow time and number of tardy jobs
- Single Machine Scheduling to Minimize Total Weighted Late Work
- Single‐machine scheduling with deadlines to minimize the total weighted late work
- Multiagent Scheduling
- Pareto‐optimization of three‐agent scheduling to minimize the total weighted completion time, weighted number of tardy jobs, and total weighted late work
- Pareto‐scheduling with double‐weighted jobs to minimize the weighted number of tardy jobs and total weighted late work
This page was built for publication: Bicriterion Pareto‐scheduling of equal‐length jobs on a single machine related to the total weighted late work