An improved genetic algorithm for the berth scheduling with ship-to-ship transshipment operations integrated model
From MaRDI portal
Publication:6065602
DOI10.1016/j.cor.2023.106409MaRDI QIDQ6065602
Marwa Al Samrout, Abdelkader Sbihi, Adnan Yassine
Publication date: 15 November 2023
Published in: Computers \& Operations Research (Search for Journal in Brave)
Cites Work
- A follow-up survey of berth allocation and quay crane scheduling problems in container terminals
- Effect of block length and yard crane deployment systems on overall performance at a seaport container transshipment terminal
- A multi-stage parallel-processor flowshop problem with minimum flowtime
- An efficient genetic algorithm for the \(p\)-median problem
- New exact methods for the time-invariant berth allocation and quay crane assignment problem
- Integrated planning of ship deployment, service schedule and container routing
- Transshipment of containers at a container terminal: An overview
- Berth allocation and quay crane assignment/scheduling problem under uncertainty: a survey
- A new method for solving conditioned maxima problems
- A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility
- Berth assignment for liner carrier clusters under a cooperative environment
- The Created Response Surface Technique for Optimizing Nonlinear, Restrained Systems
- Terminal allocation problem in a transshipment hub considering bunker consumption
- A genetic algorithm for the steel continuous casting with inter-sequence dependent setups and dedicated machines
- Berth scheduling for container terminals by using a sub-gradient optimization technique
- The Dynamic Berth Allocation Problem: A linearized formulation
- A Note on the Sequential Unconstrained Minimization Technique for Non-Linear Programming
- Extensions of SUMT for Nonlinear Programming: Equality Constraints and Extrapolation
- Exact and metaheuristic approaches to solve the integrated production scheduling, berth allocation and storage yard allocation problem
- Berth and quay crane allocation and scheduling problem with renewable energy uncertainty: a robust exact decomposition
This page was built for publication: An improved genetic algorithm for the berth scheduling with ship-to-ship transshipment operations integrated model