Metaheuristic for the capacitated lot-sizing problem: a software tool for MPS elaboration
DOI10.1504/IJMOR.2010.035496zbMath1198.90121OpenAlexW2085944090MaRDI QIDQ606601
Michel Gourgand, David Lemoine, Sylvie Norre
Publication date: 17 November 2010
Published in: International Journal of Mathematics in Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1504/ijmor.2010.035496
MPSschedulingmetaheuristicssimulated annealingproduction planningmathematical modellingsoftware toolscapacitated lot sizing problembi-objective functionCLSPmaster production scheduleneighbourhood system
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Production models (90B30) Computational methods for problems pertaining to operations research and mathematical programming (90-08)