Integrated time–cost tradeoff and resources leveling problems with allowed activity splitting
From MaRDI portal
Publication:6066283
DOI10.1111/itor.12329OpenAlexW2549194707MaRDI QIDQ6066283
Unnamed Author, Unnamed Author, Moncer A. Hariga
Publication date: 15 November 2023
Published in: International Transactions in Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1111/itor.12329
Related Items (3)
The contractor time–cost–credit trade‐off problem: integer programming model, heuristic solution, and business insights ⋮ An updated survey of variants and extensions of the resource-constrained project scheduling problem ⋮ A robust time-cost-quality-energy-environment trade-off with resource-constrained in project management: a case study for a bridge construction project
Cites Work
- Discrete time/cost trade-off problem: a decomposition-based solution algorithm for the budget version
- Optimal procedures for the discrete time/cost trade-off problem in project networks
- An evaluation of the adequacy of project network generators with systematically sampled networks
- An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation
- Resource-constrained project scheduling through the goal programming model: integration of the manager's preferences
- An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems
- An evolutionary implicit enumeration procedure for solving the resource‐constrained project scheduling problem
- A multi‐objective customer orders assignment and resource leveling in make‐to‐order manufacturing
This page was built for publication: Integrated time–cost tradeoff and resources leveling problems with allowed activity splitting