Unsupervised parallel machines scheduling with tool switches
From MaRDI portal
Publication:6068687
DOI10.1016/j.cor.2023.106361MaRDI QIDQ6068687
Ivo J. B. F. Adan, Koen Herps, Tugce Martagan, Jasper Heinrich, Quang-Vinh Dang
Publication date: 13 November 2023
Published in: Computers \& Operations Research (Search for Journal in Brave)
Cites Work
- Unnamed Item
- Improved integer linear programming formulations for the job sequencing and tool switching problem
- Hybrid method with CS and BRKGA applied to the minimization of tool switches problem
- A multi objective optimization approach for flexible job shop scheduling problem under random machine breakdown by evolutionary algorithms
- The scheduling problem of PCBs for multiple non-identical parallel machines
- Sequencing unreliable jobs on parallel machines
- Minimizing total flow time on a single flexible machine
- Improved heuristic algorithms for the job sequencing and tool switching problem
- An algorithmic framework for tool switching problems with multiple objectives
- Scheduling identical parallel machines with tooling constraints
- Order picking along a crane-supplied pick face: the SKU switching problem
- A simple and effective hybrid genetic search for the job sequencing and tool switching problem
- A matheuristic for parallel machine scheduling with tool replacements
- An iterated local search procedure for the job sequencing and tool switching problem with non-identical parallel machines
- Parallel machine scheduling with tool loading
- Scheduling multi-colour print jobs with sequence-dependent setup times
- A hybrid genetic and variable neighborhood descent algorithm for flexible job shop scheduling problems
- Minimising tool switching and indexing times by ant colony optimisation in automatic machining centres
- Solving the Job Sequencing and Tool Switching Problem as a nonlinear least cost Hamiltonian cycle problem
- Improving Discrete Model Representations via Symmetry Considerations
- Network Models and Optimization
- Models Arising from a Flexible Manufacturing Machine, Part I: Minimization of the Number of Tool Switches
- Models Arising from a Flexible Manufacturing Machine, Part II: Minimization of the Number of Switching Instants
This page was built for publication: Unsupervised parallel machines scheduling with tool switches