Bi‐criteria formulation for green scheduling with unrelated parallel machines with sequence‐dependent setup times
From MaRDI portal
Publication:6070133
DOI10.1111/itor.12566OpenAlexW2808566783MaRDI QIDQ6070133
Unnamed Author, Marcone Jamilson Freitas Souza, Vitor N. Coelho, Frederico Gadelha Guimarães
Publication date: 20 November 2023
Published in: International Transactions in Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1111/itor.12566
Related Items (2)
Coordination mechanisms for scheduling games with machine modification ⋮ A multi‐objective hybrid evolutionary search algorithm for parallel production line balancing problem including disassembly and assembly tasks
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Carbon-efficient scheduling of flow shops by multi-objective optimization
- Green scheduling of a two-machine flowshop: trade-off between makespan and energy consumption
- ABC-based manufacturing scheduling for unrelated parallel machines with machine-dependent and job sequence-dependent setup times
- A branch-and-price algorithm for scheduling parallel machines with sequence dependent setup times
- Scheduling unrelated parallel machines with sequence-dependent setups
- Two-phase Pareto local search for the biobjective traveling salesman problem
- Variable neighbourhood search: Methods and applications
- Unrelated parallel machine scheduling using local search
- Set-up coordination between two stages of a supply chain
- A multi-objective green UAV routing problem
- Green scheduling, flows and matchings
- Decomposition Methods for the Parallel Machine Scheduling Problem with Setups
- An effective heuristic for minimising makespan on unrelated parallel machines
- Coordination of set-ups between two stages of a supply chain using multi-objective genetic algorithms
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Evaluating scheduling heuristics for non-identical parallel processors
- Heuristic scheduling of parallel machines with sequence-dependent set-up times
- Simulated annealing for parallel machine scheduling with earliness-tardiness penalties and sequence-dependent set-up times
- Reducibility among Combinatorial Problems
- Scheduling
This page was built for publication: Bi‐criteria formulation for green scheduling with unrelated parallel machines with sequence‐dependent setup times