Pareto‐optimization of three‐agent scheduling to minimize the total weighted completion time, weighted number of tardy jobs, and total weighted late work
DOI10.1002/nav.21961zbMath1523.90226OpenAlexW3100829966MaRDI QIDQ6076476
C. T. Daniel Ng, Yuan Zhang, Jinjiang Yuan, Cheng, T. C. Edwin
Publication date: 17 October 2023
Published in: Naval Research Logistics (NRL) (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1002/nav.21961
schedulingtotal weighted completion timeweighted number of tardy jobstotal weighted late workthree-agent Pareto-optimization
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (6)
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Single machine scheduling with two competing agents, arbitrary release dates and unit processing times
- Single machine scheduling with two competing agents and equal job processing times
- A scheduling problem with three competing agents
- Pareto optimization scheduling with two competing agents to minimize the number of tardy jobs and the maximum cost
- Complexities of four problems on two-agent scheduling
- Price of fairness in two-agent single-machine scheduling problems
- Two-agent single-machine scheduling with cumulative deterioration
- Complexities of some problems on multi-agent scheduling on a single machine
- Two-agent scheduling of unit processing time jobs to minimize total weighted completion time and total weighted number of tardy jobs
- Single-machine scheduling with multi-agents to minimize total weighted late work
- A just-in-time scheduling problem with two competing agents
- Two-agent single-machine scheduling problem with just-in-time jobs
- The complexity of CO-agent scheduling to minimize the total completion time and total number of tardy jobs
- Scheduling with release dates and preemption to minimize multiple max-form objective functions
- Two-agent scheduling problems on a single-machine to minimize the total weighted late work
- Multi-agent scheduling on a single machine with a fixed number of competing agents to minimize the weighted sum of number of tardy jobs and makespans
- A note on a two-agent scheduling problem related to the total weighted late work
- A multiple-criterion model for machine scheduling
- Scheduling Problems with Two Competing Agents
- Single Machine Scheduling to Minimize Total Late Work
- Algorithms for Scheduling Independent Tasks
- CON/SLK due date assignment and scheduling on a single machine with two agents
- Single Machine Scheduling to Minimize Total Weighted Late Work
- Multiagent Scheduling
- An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs
- A Functional Equation and its Application to Resource Allocation and Sequencing Problems
This page was built for publication: Pareto‐optimization of three‐agent scheduling to minimize the total weighted completion time, weighted number of tardy jobs, and total weighted late work