Pareto‐scheduling with double‐weighted jobs to minimize the weighted number of tardy jobs and total weighted late work
From MaRDI portal
Publication:6077487
DOI10.1002/nav.22050zbMath1523.90159OpenAlexW4213345466MaRDI QIDQ6077487
Cheng, T. C. Edwin, Shuen Guo, Jinjiang Yuan, Ling-Fa Lu, C. T. Daniel Ng
Publication date: 18 October 2023
Published in: Naval Research Logistics (NRL) (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1002/nav.22050
schedulingdynamic programmingFPTASweighted number of tardy jobsPareto-optimal pointsweighted late work
Related Items (1)
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Single machine scheduling with two competing agents and equal job processing times
- A survey of single machine scheduling to minimize weighted number of tardy jobs
- On an extension of the Sort \& Search method with application to scheduling theory
- Minimizing mean weighted execution time loss on identical and uniform processors
- Pareto optimization scheduling with two competing agents to minimize the number of tardy jobs and the maximum cost
- New algorithms for minimizing the weighted number of tardy jobs on a single machine
- Bi-criteria scheduling problems: Number of tardy jobs and maximum weighted tardiness
- Minimizing the number of tardy job units under release time constraints
- A note on the single machine scheduling to minimize the number of tardy jobs with deadlines
- Approximation algorithms for scheduling a single machine to minimize total late work
- Minimizing the weighted number of tardy task units
- Concurrent open shop scheduling to minimize the weighted number of tardy jobs
- A two-agent single-machine scheduling problem with late work criteria
- Scheduling on parallel identical machines with late work criterion: offline and online cases
- Single machine preemptive scheduling with fixed jobs to minimize tardiness related criteria
- The two-machine flow-shop problem with weighted late work criterion and common due date
- Heterogeneous-criteria scheduling: Minimizing weighted number of tardy jobs and weighted completion time
- Two-agent preemptive Pareto-scheduling to minimize the number of tardy jobs and total late work
- Two-agent scheduling of unit processing time jobs to minimize total weighted completion time and total weighted number of tardy jobs
- Minimizing total late work on a single machine with generalized due-dates
- Pareto-scheduling of two competing agents with their own equal processing times
- Single-machine scheduling of proportional-linearly deteriorating jobs with positional due indices
- Single-machine scheduling with multi-agents to minimize total weighted late work
- Scheduling to tradeoff between the number and the length of accepted jobs
- The complexity of CO-agent scheduling to minimize the total completion time and total number of tardy jobs
- A note on single-machine scheduling to tradeoff between the number of tardy jobs and the start time of machine
- Bicriteria scheduling of equal length jobs on uniform parallel machines
- Two-agent scheduling problems on a single-machine to minimize the total weighted late work
- A note on the complexity of the problem of two-agent scheduling on a single machine
- Unary NP-hardness of minimizing the number of tardy jobs with deadlines
- Multi-agent scheduling on a single machine with a fixed number of competing agents to minimize the weighted sum of number of tardy jobs and makespans
- A note on a two-agent scheduling problem related to the total weighted late work
- A stronger complexity result for the single machine multi-operation jobs scheduling problem to minimize the number of tardy jobs
- Multi-agent scheduling on a single machine to minimize total weighted number of tardy jobs
- Complexity of two dual criteria scheduling problems
- Scheduling with competing agents, total late work and job rejection
- Scheduling Problems with Two Competing Agents
- Single Machine Scheduling to Minimize Total Late Work
- Algorithms for Scheduling Independent Tasks
- A Fully Polynomial Approximation Scheme for Scheduling a Single Machine to Minimize Total Weighted Late Work
- When Does a Dynamic Programming Formulation Guarantee the Existence of a Fully Polynomial Time Approximation Scheme (FPTAS)?
- Single Machine Scheduling with Deadlines to Minimize the Weighted Number of Tardy Jobs
- Single Machine Scheduling to Minimize Total Weighted Late Work
- Reducibility among Combinatorial Problems
- Single‐machine scheduling with deadlines to minimize the total weighted late work
- Multiagent Scheduling
- An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs
- A Functional Equation and its Application to Resource Allocation and Sequencing Problems
- Pareto‐optimization of three‐agent scheduling to minimize the total weighted completion time, weighted number of tardy jobs, and total weighted late work
This page was built for publication: Pareto‐scheduling with double‐weighted jobs to minimize the weighted number of tardy jobs and total weighted late work