Impact of emission and service constraint for an imperfect production system under two level Hamiltonian
From MaRDI portal
Publication:6081047
DOI10.1002/OCA.3003MaRDI QIDQ6081047
Unnamed Author, Subhajit Das, Asoke Kumar Bhunia, Ali Akbar Shaikh
Publication date: 25 October 2023
Published in: Optimal Control Applications and Methods (Search for Journal in Brave)
optimal controlservice levelimperfect productionTLBO algorithmemission levelHamiltonian maximum principle
Production theory, theory of the firm (91B38) Environmental economics (natural resource models, harvesting, pollution, etc.) (91B76)
Related Items (1)
Cites Work
- Unnamed Item
- Single-vendor multi-buyer integrated production-inventory model with controllable lead time and service level constraints
- Multi-objective optimization of heat exchangers using a modified teaching-learning-based optimization algorithm
- Product replacement policy in a production inventory model with replacement period-, stock-, and price-dependent demand
- Modeling of a carbon emitted production inventory system with interval uncertainty via meta-heuristic algorithms
- Low carbon inventory model for vendor-buyer system with hybrid production and adjustable production rate under stochastic demand
- An application of control theory for imperfect production problem with carbon emission investment policy in interval environment
- Joint pricing and inventory decisions with carbon emission considerations, partial backordering and planned discounts
- Optimal control of work-in-process inventory of a two-station production line
- Imperfect Quality Item Inventory Models Considering Carbon Emissions
- Multi-item Optimal control problem with fuzzy costs and constraints using Fuzzy variational principle
- Optimal control of the production–inventory system with deteriorating items and tradable emission permits
- Four inventory models for deteriorating items with time varying demand and partial backlogging: A cost comparison
This page was built for publication: Impact of emission and service constraint for an imperfect production system under two level Hamiltonian