Short‐term scheduling with machine calibration
From MaRDI portal
Publication:6082198
DOI10.1111/itor.12997OpenAlexW3164013752MaRDI QIDQ6082198
Zhijun Xu, Limin Xu, Xian-Yu Yu, Dehua Xu
Publication date: 29 November 2023
Published in: International Transactions in Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1111/itor.12997
Cites Work
- Single-machine scheduling problems with both start-time dependent learning and position dependent aging effects under deteriorating maintenance consideration
- Minimizing total completion time on a single machine with a flexible maintenance activity
- Single machine flow-time scheduling with scheduled maintenance
- Improved algorithms for two single machine scheduling problems
- Single machine flow-time scheduling with a single breakdown
- A mathematical model and heuristic algorithms for an unrelated parallel machine scheduling problem with sequence-dependent setup times, machine eligibility restrictions and a common server
- An improved approximation algorithm for the single machine total completion time scheduling problem with availability constraints
- Heuristics for the single machine weighted sum of completion times scheduling problem with periodic maintenance
- Machine scheduling with an availability constraint
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Heuristics for the two‐machine scheduling problem with a single server
- Scheduling
- An MO‐GVNS algorithm for solving a multiobjective hybrid flow shop scheduling problem
- A biased‐randomized iterated local search for the distributed assembly permutation flow‐shop problem
- Multi‐level, multi‐stage lot‐sizing and scheduling in the flexible flow shop with demand information updating
This page was built for publication: Short‐term scheduling with machine calibration