Hybrid differential evolution algorithm for the resource constrained project scheduling problem with a flexible project structure and consumption and production of resources
From MaRDI portal
Publication:6087528
DOI10.1016/j.ejor.2023.07.043MaRDI QIDQ6087528
No author found.
Publication date: 15 November 2023
Published in: European Journal of Operational Research (Search for Journal in Brave)
project schedulingmetaheuristicsresource constrained project scheduling problemflexible project structure
Cites Work
- Scheduling resource-constrained projects with a flexible project structure
- Production scheduling with alternative process plans
- Algorithms for propagating resource constraints in AI planning and scheduling: Existing approaches and new results
- Artificial life and computational intelligence. Second Australasian conference, ACALCI 2016, Canberra, ACT, Australia, February 2--5, 2016. Proceedings
- The project scheduling problem with production and consumption of resources: a list-scheduling based algorithm
- Scheduling subject to resource constraints: Classification and complexity
- Differential evolution -- a simple and efficient heuristic for global optimization over continuous spaces
- A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs
- Project scheduling with inventory constraints
- A hybrid metaheuristic for the resource-constrained project scheduling problem
- A hybrid genetic algorithm for the resource-constrained project scheduling problem
- An evolutionary approach for resource constrained project scheduling with uncertain changes
This page was built for publication: Hybrid differential evolution algorithm for the resource constrained project scheduling problem with a flexible project structure and consumption and production of resources