Coordinated optimized scheduling of locks and transshipment in inland waterway transportation using binary NSGA‐II
From MaRDI portal
Publication:6090473
DOI10.1111/itor.12720OpenAlexW2973477070MaRDI QIDQ6090473
Xiao-Rong Wang, Xiaohui Yuan, Bin Ji, Yanbin Yuan, Hongjun Sun
Publication date: 17 November 2023
Published in: International Transactions in Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1111/itor.12720
Cites Work
- A follow-up survey of berth allocation and quay crane scheduling problems in container terminals
- The lockmaster's problem
- A combinatorial Benders' decomposition for the lock scheduling problem
- Lockage scheduling of three gorges-gezhouba dams by hybrid of chaotic particle swarm optimization and heuristic-adjusted strategies
- Improved hybrid simulated annealing algorithm for navigation scheduling for the two dams of the Three Gorges Project
- Optimal sequencing in the presence of setup times for tow/barge traffic through a river lock
- A model for solving incompatible fuzzy goal programming: an application to portfolio selection
- Iterated local search and simulated annealing algorithms for the inventory routing problem
- Multiobjective model for solving resource‐leveling problem with discounted cash flows
- An ERNSGA‐III algorithm for the production and distribution planning problem in the multiagent supply chain
- Optimizing a linear function over the nondominated set of multiobjective integer programs
This page was built for publication: Coordinated optimized scheduling of locks and transshipment in inland waterway transportation using binary NSGA‐II