An ERNSGA‐III algorithm for the production and distribution planning problem in the multiagent supply chain
From MaRDI portal
Publication:6091879
DOI10.1111/itor.12654OpenAlexW2925333884WikidataQ128183847 ScholiaQ128183847MaRDI QIDQ6091879
Publication date: 21 November 2023
Published in: International Transactions in Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1111/itor.12654
Related Items (4)
A mixed‐integer linear programming model and a metaheuristic approach for the selection and allocation of land parcels problem ⋮ Coordinated optimized scheduling of locks and transshipment in inland waterway transportation using binary NSGA‐II ⋮ A two‐layer approach for solving robust decentralized multiproject scheduling problem with multi‐skilled staff ⋮ A review on integrated scheduling and outbound vehicle routing problems
Cites Work
- Unnamed Item
- Unnamed Item
- Single machine batch scheduling with release times and delivery costs
- Parallel machines scheduling to minimize job tardiness and machine deteriorating cost with deteriorating jobs
- Single machine scheduling with batch deliveries
- On scheduling to minimize earliness-tardiness and batch delivery costs with a common due date
- Coordination of production and distribution planning
- A honey-bees optimization algorithm for a two-agent single-machine scheduling problem with ready times
- An improved version of the augmented \(\varepsilon\)-constraint method (AUGMECON2) for finding the exact Pareto set in multi-objective integer programming problems
- A common framework and taxonomy for multicriteria scheduling problems with interfering and competing jobs: multi-agent scheduling problems
- A Lagrangian approach to single-machine scheduling problems with two competing agents
- A multiple-criterion model for machine scheduling
- The Integrated Production and Transportation Scheduling Problem for a Product with a Short Lifespan
- Integrated Production and Outbound Distribution Scheduling: Review and Extensions
- Scheduling a production-distribution system to optimize the tradeoff between delivery tardiness and distribution cost
- Integrated Scheduling of Production and Distribution Operations
- Supply Chain Scheduling: Batching and Delivery
- Scheduling Problems with Two Competing Agents
- Heuristic Techniques for Simultaneous Scheduling of Production and Distribution in Multi-Echelon Structures: Theory and Empirical Comparisons
- Pareto simulated annealing—a metaheuristic technique for multiple‐objective combinatorial optimization
- An integrated production–distribution inventory system involving probabilistic defective and errors in quality inspection under variable setup cost
- Multiagent Scheduling
- An integrated approach for production and distribution planning in supply chain management
- Machine scheduling with transportation considerations
This page was built for publication: An ERNSGA‐III algorithm for the production and distribution planning problem in the multiagent supply chain