Intelligent optimization under the makespan constraint: rapid evaluation mechanisms based on the critical machine for the distributed flowshop group scheduling problem
From MaRDI portal
Publication:6096611
DOI10.1016/j.ejor.2023.05.010MaRDI QIDQ6096611
Kai-Zhou Gao, Yuhang Wang, Yu-Ting Wang, Jun-Qing Li, Yuyan Han, Mehmet Fatih Tasgetiren
Publication date: 15 September 2023
Published in: European Journal of Operational Research (Search for Journal in Brave)
Cites Work
- Unnamed Item
- A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem
- Some efficient heuristic methods for the flow shop sequencing problem
- The distributed permutation flowshop scheduling problem
- Scheduling a flowline manufacturing cell with sequence dependent family setup times
- No-wait flowshop scheduling problem with two criteria; total tardiness and makespan
- Heuristics for no-wait flowshops with makespan subject to mean completion time
- Metaheuristic algorithms for the hybrid flowshop scheduling problem
- No-wait flowshop scheduling problem with separate setup times to minimize total tardiness subject to makespan
- Generalised accelerations for insertion-based heuristics in permutation flowshop scheduling
- Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups
- Iterated greedy algorithms enhanced by hyper-heuristic based learning for hybrid flexible flowshop scheduling problem with sequence dependent setup times: a case study at a manufacturing plant
This page was built for publication: Intelligent optimization under the makespan constraint: rapid evaluation mechanisms based on the critical machine for the distributed flowshop group scheduling problem