Robust counterpart mathematical models for balancing, sequencing, and assignment of robotic U-shaped assembly lines with considering failures and setup times
From MaRDI portal
Publication:6105933
DOI10.1007/s12597-022-00609-wOpenAlexW4308260257MaRDI QIDQ6105933
Parvaneh Samouei, Mahsa Sobhishoja
Publication date: 26 June 2023
Published in: Opsearch (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s12597-022-00609-w
metaheuristicsrobust optimizationNSGA-IIpreventive maintenanceharmony search algorithmsequence-dependent setup timerobotic U-shaped mixed-model assembly line
Cites Work
- A decomposition based solution algorithm for U-type assembly line balancing with interval data
- A review of piecewise linearization methods
- The sequence-dependent assembly line balancing problem
- Multiple-criteria decision-making in two-sided assembly line balancing: a goal programming and a fuzzy goal programming model
- Corrigendum to ``Balancing and scheduling tasks in assembly lines with sequence-dependent setup [European Journal of Operational Research 187 (2008) 1212-1223]
- The robust (minmax regret) assembly line worker assignment and balancing problem
- The assembly line balancing and scheduling problem with sequence-dependent setup times: problem extension, model formulation and efficient heuristics
- Developing optimization \& robust models for a mixed-model assembly line balancing problem with semi-automated operations
- Metaheuristic algorithms for balancing robotic assembly lines with sequence-dependent robot setup times
- Balancing and scheduling tasks in assembly lines with sequence-dependent setup times
- Assembly Line Planning and Control
- A multiple single-pass heuristic algorithm solving the stochastic assembly line rebalancing problem
- Balancing two-sided assembly lines with sequence-dependent setup times
- Robust optimization for U-shaped assembly line worker assignment and balancing problem with uncertain task times
This page was built for publication: Robust counterpart mathematical models for balancing, sequencing, and assignment of robotic U-shaped assembly lines with considering failures and setup times