A prediction model for ranking branch-and-bound procedures for the resource-constrained project scheduling problem
From MaRDI portal
Publication:6106485
DOI10.1016/j.ejor.2022.08.042MaRDI QIDQ6106485
Weikang Guo, Mario Vanhoucke, José Coelho
Publication date: 3 July 2023
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://biblio.ugent.be/publication/01GVDSXXZNPANG2G2PPEVKR5JF
Cites Work
- Unnamed Item
- Unnamed Item
- An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem
- On the use of genetic programming to evolve priority rules for resource constrained project scheduling problems
- Experimental investigation of heuristics for resource-constrained project scheduling: an update
- Multilabel classification via calibrated label ranking
- Scheduling subject to resource constraints: Classification and complexity
- PSPLIB -- a project scheduling problem library
- A branch and bound algorithm for the resource-constrained project scheduling problem
- A branch-and-bound algorithm for the resource-constrained project scheduling problem
- Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
- Ranking and unranking permutations in linear time
- Model selection in kernel ridge regression
- An exact composite lower bound strategy for the resource-constrained project scheduling problem
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Computing lower bounds by destructive improvement: An application to resource-constrained project scheduling
- The multiple resource constrained project scheduling problem: A breadth-first approach
- Project scheduling with resource constraints: A branch and bound approach. Note by Frederik Kaefer
- Privacy-preserving ridge regression on distributed data
- Optimal rates for the regularized least-squares algorithm
- Label ranking by learning pairwise preferences
- An evaluation of the adequacy of project network generators with systematically sampled networks
- Rangen: A random network generator for activity-on-the-node networks
- Going to the core of hard resource-constrained project scheduling instances
- An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation
- Scheduling Resource-Constrained Projects Competitively at Modest Memory Requirements
- A new approach to mining fuzzy databases using nearest neighbor classification by exploiting attribute hierarchies
- A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem
- Linear-Time Ranking of Permutations
- New representation to reduce the search space for the resource-constrained project scheduling problem
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- A Horizon-Varying, Zero-One Approach to Project Scheduling
- Project scheduling: The effects of problem structure on heuristic performance
- Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation
- An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems
- New Benchmark Results for the Resource-Constrained Project Scheduling Problem
- Solving resource-constrained project scheduling problems by a* search
- Ridge Regression: Biased Estimation for Nonorthogonal Problems
- An Experimental Investigation and Comparative Evaluation of Production Line Balancing Techniques
This page was built for publication: A prediction model for ranking branch-and-bound procedures for the resource-constrained project scheduling problem