On the complexity of efficient multi-skilled team composition
From MaRDI portal
Publication:6106584
DOI10.1016/j.cor.2023.106277OpenAlexW4377695239MaRDI QIDQ6106584
Jakob Snauwaert, Mario Vanhoucke, Rob Van Eynde
Publication date: 3 July 2023
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2023.106277
Cites Work
- Unnamed Item
- Workforce planning incorporating skills: state of the art
- The multiple team formation problem using sociometry
- Computing cooperative solution concepts in coalitional skill games
- Coalition structure generation: a survey
- Heuristics for workforce planning with worker differences
- Multi-objective decision analysis for competence-oriented project portfolio selection
- Optimizing daily agent scheduling in a multiskill call center
- A genetic algorithm for scheduling staff of mixed skills under multi-criteria
- A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints
- Minimizing average project team size given multi-skilled workers with heterogeneous skill levels
- A biased random-key genetic algorithm for the project scheduling problem with flexible resources
- Resource-constrained project scheduling: Notation, classification, models, and methods
- A new algorithm for resource-constrained project scheduling with breadth and depth of skills
- An integrated solution approach for multi-objective, multi-skill workforce scheduling and routing problems
- Personnel scheduling: a literature review
- Scheduling projects with multi-skilled personnel by a hybrid MILP/CP Benders decomposition algorithm
- On the Complexity of General Graph Factor Problems
- A Branch-and-Bound method for solving Multi-Skill Project Scheduling Problem
- On a multi-project staffing problem with heterogeneously skilled workers
- Contingent manpower planning in a high clock speed industry
- A classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problem
This page was built for publication: On the complexity of efficient multi-skilled team composition