A multi-objective linear programming model for scheduling part families and designing a group layout in cellular manufacturing systems
From MaRDI portal
Publication:6109299
DOI10.1016/j.cor.2022.106090OpenAlexW4309577341MaRDI QIDQ6109299
Rasool Motahari, Abdullah Zareh Andaryan, Morteza Saberi, Zeinolabedin Alavifar, Maxwell Chipulu
Publication date: 4 July 2023
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2022.106090
cell formationgroup technologymulti-objective linear programminggroup schedulinggroup layoutcellular manufacturing system
Cites Work
- Unnamed Item
- Unnamed Item
- Path-relinking tabu search for the multi-objective flexible job shop scheduling problem
- A hybrid genetic-variable neighborhood search algorithm for the cell formation problem based on grouping efficacy
- Bi-criteria sequencing of courses and formation of classes for a bottleneck classroom
- An exact \(\epsilon\)-constraint method for bi-objective combinatorial optimization problems: Application to the traveling salesman problem with profits
- Nonlinear multiobjective optimization
- Formation of machine cells and part families in cellular manufacturing systems using a linear assignment algorithm.
- Using penalty function and tabu search to solve cell formation problems with fixed cell cost.
- Parallel iterative solution-based Tabu search for the obnoxious \(p\)-median problem
- Reinforcement learning based tabu search for the minimum load coloring problem
- Bi-objective optimization for road vertical alignment design
- Multi-objective optimization of the 3D container stowage planning problem in a barge convoy system
- Adaptive simulated annealing with greedy search for the circle bin packing problem
- Multi-objective tabu search using a multinomial probability mass function
- A metaheuristic based on tabu search for solving a technician routing and scheduling problem
- Two-stage multi-neighborhood simulated annealing for uncapacitated examination timetabling
- A two-phase intensification tabu search algorithm for the maximum min-sum dispersion problem
- Fleet and charging infrastructure decisions for fast-charging city electric bus service
- A novel constraint programming and simulated annealing for disassembly line balancing problem with and/or precedence and sequence dependent setup times
- Tabu Search—Part I
- Application of simulated annealing to a linear model forthe formulation of machine cells ingroup technology
- Bicriterion Single Machine Scheduling with Resource Dependent Processing Times
- CF-GGA: A grouping genetic algorithm for the cell formation problem
- Multiproduct batching and scheduling with buffered rework: The case of a car paint shop
- Integration of parts scheduling, MRP, production planning and generalized fixed-charge transportation planning in the design of a dynamic cellular manufacturing system
- Manufacturing cell design with alternative routings in generalized group technology: reducing the complexity of the solution space
This page was built for publication: A multi-objective linear programming model for scheduling part families and designing a group layout in cellular manufacturing systems