A branch-and-bound algorithm for the unit-capacity resource constrained project scheduling problem with transfer times
From MaRDI portal
Publication:6109310
DOI10.1016/j.cor.2022.106097MaRDI QIDQ6109310
No author found.
Publication date: 4 July 2023
Published in: Computers \& Operations Research (Search for Journal in Brave)
Cites Work
- A flow-based tabu search algorithm for the RCPSP with transfer times
- A filter-and-fan approach with adaptive neighborhood switching for resource-constrained project scheduling
- Production scheduling with alternative process plans
- An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relations
- Event-based MILP models for resource-constrained project scheduling problems
- A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times
- Scheduling subject to resource constraints: Classification and complexity
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- PSPLIB -- a project scheduling problem library
- A branch and bound algorithm for the resource-constrained project scheduling problem
- An exact algorithm for project scheduling with multiple modes
- Lower bounds for resource-constrained project scheduling problems.
- Solving the resource-constrained project scheduling problem by a variable neighbourhood search.
- A linear programming and constraint propagation-based lower bound for the RCPSP
- An exact composite lower bound strategy for the resource-constrained project scheduling problem
- An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: the single mode case
- Enhanced energetic reasoning-based lower bounds for the resource constrained project scheduling problem
- Bidirectional planning: Improving priority rule-based heuristics for scheduling resource-constrained projects
- A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags
- A tree search heuristic for the resource constrained project scheduling problem with transfer times
- An efficient filtering algorithm for the unary resource constraint with transition times and optional activities
- A survey of hybrid metaheuristics for the resource-constrained project scheduling problem
- Strong bounds for resource constrained project scheduling: preprocessing and cutting planes
- A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem
- Managing and modelling general resource transfers in (multi-)project scheduling
- Augmenting priority rule heuristics with justification and rollout to solve the resource-constrained project scheduling problem
- A hybrid scatter search/electromagnetism meta-heuristic for project scheduling
- An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation
- A Time-Oriented Branch-and-Bound Algorithm for Resource-Constrained Project Scheduling with Generalised Precedence Constraints
- Scheduling Resource-Constrained Projects Competitively at Modest Memory Requirements
- A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem
- A Branch-and-Bound method for solving Multi-Skill Project Scheduling Problem
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- A Branch and Bound Procedure for the Resource Constrained Project Scheduling Problem with Discounted Cash Flows
- A Branch-and-Bound Procedure for the Generalized Resource-Constrained Project Scheduling Problem
- New Benchmark Results for the Resource-Constrained Project Scheduling Problem
- An exact procedure for the resource-constrained weighted earliness-tardiness project scheduling problem
- A high-performance exact method for the resource-constrained project scheduling problem
- An iterative time‐bucket refinement algorithm for a high‐resolution resource‐constrained project scheduling problem