Evaluation of the quantiles and superquantiles of the makespan in interval valued activity networks
From MaRDI portal
Publication:6109311
DOI10.1016/j.cor.2022.106098MaRDI QIDQ6109311
Publication date: 4 July 2023
Published in: Computers \& Operations Research (Search for Journal in Brave)
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Setting optimal due dates in a basic safe-scheduling model
- Single machine scheduling problem with interval processing times to minimize mean weighted completion time
- Minimizing conditional-value-at-risk for stochastic scheduling problems
- Minimizing value-at-risk in single-machine scheduling
- Criticality analysis of activity networks under interval uncertainty
- A rollout metaheuristic for job shop scheduling problems
- Project bidding under deterministic and probabilistic activity durations
- Experimental investigation of heuristics for resource-constrained project scheduling: an update
- Risk-averse profit-based optimal scheduling of a hydro-chain in the day-ahead electricity market
- Shortfall as a risk measure: properties, optimization and applications
- Evaluating project completion time in project networks with discrete random activity durations
- A quantile-based approach to system selection
- Computing latest starting times of activities in interval-valued networks with minimal time lags
- PSPLIB -- a project scheduling problem library
- A fuzzy robust scheduling approach for product development projects.
- Project scheduling. A research handbook.
- Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
- A fuzzy project scheduling approach to minimize schedule risk for product development
- Distributionally robust single machine scheduling with risk aversion
- Expected shortfall: heuristics and certificates
- On computing the latest starting times and floats of activities in a network with imprecise durations
- Project scheduling under uncertainty: survey and research potentials
- On the fallacy of averages in project risk management
- Makespan estimation and order acceptance in batch process industries when processing times are uncertain
- Rescheduling manufacturing systems: A framework of strategies, policies, and methods
- A mixed integer programming formulation for the total flow time single machine robust scheduling problem with interval data
- Appointment scheduling with a quantile objective
- Sequencing with uncertain numerical data for makespan minimisation
- Critical-Path Planning and Scheduling: Mathematical Basis
- Principles of Sequencing and Scheduling
- Stochastic Scheduling with Release Dates and Due Dates
- Optimal Reduction of Two-Terminal Directed Acyclic Graphs
- Robust Scheduling to Hedge Against Processing Time Uncertainty in Single-Stage Production
- Expected Critical Path Lengths in PERT Networks
- Manufacturing Scheduling Systems
- The computational complexity of the criticality problems in a network with interval activity times
This page was built for publication: Evaluation of the quantiles and superquantiles of the makespan in interval valued activity networks