Dynamic shop-floor scheduling using real-time information: a case study from the thermoplastic industry
From MaRDI portal
Publication:6109347
DOI10.1016/j.cor.2022.106134OpenAlexW4313420447MaRDI QIDQ6109347
Mageed Ghaleb, Sharareh Taghipour
Publication date: 4 July 2023
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2022.106134
simulated annealingdynamic schedulingreal-time informationparallel machines schedulingpredictive-reactive schedulingIndustry 4.0
Cites Work
- Optimization by Simulated Annealing
- Multiple-objective scheduling and real-time dispatching for the semiconductor manufacturing system
- Using real time information for effective dynamic scheduling
- Iterated greedy algorithms for the blocking flowshop scheduling problem with makespan criterion
- Metaheuristics for minimizing the makespan of the dynamic shop scheduling problem
- Tabu search for a parallel-machine scheduling problem with periodic maintenance, job rejection and weighted sum of completion times
- A survey of dynamic scheduling in manufacturing systems
- Real-time production scheduling in the Industry-4.0 context: addressing uncertainties in job arrivals and machine breakdowns
- A hybrid multi-objective approach for real-time flexible production scheduling and rescheduling under dynamic environment in Industry 4.0 context
- Unrelated parallel machine scheduling with new criteria: complexity and models
- Genetic programming-based hyper-heuristic approach for solving dynamic job shop scheduling problem with extended technical precedence constraints
- Search and Optimization by Metaheuristics
- Job Shop Scheduling with Due Dates and Variable Processing Times
- The Theory and Practice of Simulated Annealing
- Reactive scheduling in a dynamic and stochastic FMS environment
- Scheduling
This page was built for publication: Dynamic shop-floor scheduling using real-time information: a case study from the thermoplastic industry