The parallel AGV scheduling problem with battery constraints: a new formulation and a matheuristic approach
From MaRDI portal
Publication:6109805
DOI10.1016/j.ejor.2022.10.023OpenAlexW4306957265MaRDI QIDQ6109805
Teresa Murino, Maurizio Boccia, Claudio Sterle, Adriano Masone
Publication date: 4 July 2023
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2022.10.023
Related Items (1)
Cites Work
- Unnamed Item
- Analysis of a parallel machine scheduling problem with sequence dependent setup times and job availability intervals
- Approximation schemes for parallel machine scheduling with availability constraints
- Identical parallel-machine scheduling under availability constraints to minimize the sum of completion times
- The bottleneck generalized assignment problem
- Minimizing the makespan for the flow shop scheduling problem with availability constraints.
- Minimizing the makespan on a single machine with flexible maintenances and jobs' release dates
- Production, maintenance and resource scheduling: a review
- Planning and control of autonomous mobile robots for intralogistics: literature review and research agenda
- Parallel machine scheduling with machine availability and eligibility constraints
- Survey of research in the design and control of automated guided vehicle systems
- Scheduling heterogeneous multi-load AGVs with battery constraints
- A New Branch-and-Price-and-Cut Algorithm for One-Dimensional Bin-Packing Problems
- Modelling battery constraints in discrete event automated guided vehicle simulations
- Scheduling and routing algorithms for AGVs: A survey
- Scheduling jobs and maintenance activities on parallel machines
This page was built for publication: The parallel AGV scheduling problem with battery constraints: a new formulation and a matheuristic approach