Multi-project scheduling: a benchmark analysis of metaheuristic algorithms on various optimisation criteria and due dates
From MaRDI portal
Publication:6112409
DOI10.1016/j.ejor.2022.11.009OpenAlexW4308981513MaRDI QIDQ6112409
Dries Bredael, Mario Vanhoucke
Publication date: 10 July 2023
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://biblio.ugent.be/publication/01GVDSKM8DK03VD72VEPEQSXPS/file/01GVDW2GYA3F00D6JCPS33Y4BS
Related Items (1)
Cites Work
- The multi-mode resource-constrained multi-project scheduling problem, The MISTA 2013 challenge
- An integer programming approach to the multimode resource-constrained multiproject scheduling problem
- A \((\mu ,\, \lambda )\)-coordination mechanism for agent-based multi-project scheduling
- Multi-project scheduling with two-stage decomposition
- A decomposition approach to multi-project scheduling
- A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times
- Two-phase heuristics for scheduling of multiple projects
- An iterative scheduling technique for resource-constrained project scheduling
- An evaluation of due date, resource allocation, project release, and activity scheduling rules in a multiproject environment
- Constrained multi-project planning problems: A Lagrangean decomposition approach
- Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
- A multicriteria heuristic method to improve resource allocation in multiproject scheduling
- A multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problem
- A learning-based optimization approach to multi-project scheduling
- An updated survey of variants and extensions of the resource-constrained project scheduling problem
- Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics
- Managing and modelling general resource transfers in (multi-)project scheduling
- A market-based multi-agent system model for decentralized multi-project scheduling
- A genetic algorithm for the resource constrained multi-project scheduling problem
- Multi-mode resource constrained multi-project scheduling and resource portfolio problem
- Multi-Project Scheduling: Categorization of Heuristic Rules Performance
- A multi‐agent system for the decentralized resource‐constrained multi‐project scheduling problem
- Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiproject scheduling
This page was built for publication: Multi-project scheduling: a benchmark analysis of metaheuristic algorithms on various optimisation criteria and due dates