A Lagrangian heuristics for balancing the average weighted completion times of two classes of jobs in a single-machine scheduling problem
From MaRDI portal
Publication:6114936
DOI10.1016/j.ejco.2022.100032zbMath1530.90036OpenAlexW4281918260MaRDI QIDQ6114936
Publication date: 12 July 2023
Published in: EURO Journal on Computational Optimization (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejco.2022.100032
Cooperative games (91A12) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- An investigation on a two-agent single-machine scheduling problem with unequal release dates
- Two-agent scheduling to minimize the total cost
- Two-agent scheduling on uniform parallel machines with min-max criteria
- About Lagrangian methods in integer optimization
- An algorithm for the quadratic assignment problem using Benders' decomposition
- Price of fairness in two-agent single-machine scheduling problems
- Lagrangean relaxation. (With comments and rejoinder).
- A Lagrangian approach to single-machine scheduling problems with two competing agents
- Two-agent scheduling on a single machine with release dates
- Stability and fairness in the job scheduling problem
- A subset-sum type formulation of a two-agent single-machine scheduling problem
- A multiple-criterion model for machine scheduling
- Multi-agent single machine scheduling
- The efficiency-fairness balance of round robin scheduling
- The Price of Fairness
- Scheduling Problems with Two Competing Agents
- Improved Linear Integer Programming Formulations of Nonlinear Integer Problems
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Multiagent Scheduling
- Essentials of numerical nonsmooth optimization
This page was built for publication: A Lagrangian heuristics for balancing the average weighted completion times of two classes of jobs in a single-machine scheduling problem