A memetic algorithm for minimizing the total weighted completion time on a single machine under linear deterioration
From MaRDI portal
Publication:611516
DOI10.1016/j.apm.2010.01.002zbMath1201.90078OpenAlexW2091765017MaRDI QIDQ611516
Publication date: 14 December 2010
Published in: Applied Mathematical Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.apm.2010.01.002
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Cites Work
- A memetic algorithm for minimizing the total weighted completion time on a single machine under step-deterioration
- Time-dependent scheduling
- Multi-objective memetic algorithms
- Single machine parallel-batch scheduling with deteriorating jobs
- Conjugate problems in time-dependent scheduling
- Equivalent time-dependent scheduling problems
- Scheduling jobs under simple linear deterioration
- Single machine scheduling with start time dependent processing times: Some solvable cases
- Minimizing the total weighted completion time of deteriorating jobs
- Pareto and scalar bicriterion optimization in scheduling deteriorating jobs
- Scheduling start time dependent jobs to minimize the total weighted completion time
- Λ-Shaped Policies to Schedule Deteriorating Jobs
- Handbook of metaheuristics
- A memetic algorithm for the total tardiness single machine scheduling problem
This page was built for publication: A memetic algorithm for minimizing the total weighted completion time on a single machine under linear deterioration