Minimizing total weighted completion time with uncertain data: a stability approach
DOI10.1134/S0005117910100048zbMath1203.93130WikidataQ57633876 ScholiaQ57633876MaRDI QIDQ612208
Frank Werner, Natalja G. Egorova, Yuri N. Sotskov
Publication date: 3 January 2011
Published in: Automation and Remote Control (Search for Journal in Brave)
branch-and-bound algorithmuncertain datasingle-machine scheduling problemoptimal permutation for each possible realizationstability box
Polyhedral combinatorics, branch-and-bound, branch-and-cut (90C57) Control/observation systems with incomplete information (93C41) Control/observation systems involving computers (process control, etc.) (93C83) Robust stability (93D09) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20)
Related Items
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- On the robust single machine scheduling problem
- A 2-approximation algorithm for interval data minmax regret sequencing problems with the total flow time criterion
- Minimizing total weighted flow time of a set of jobs with interval processing times
- Stability of an optimal schedule
- On the calculation of the stability radius of an optimal or an approximate schedule
- Robust discrete optimization and its applications
- Optimal makespan scheduling with given bounds of processing times
- Two-machine flowshop scheduling problem to minimize makespan or total completion time with random and bounded setup times
- Minimizing total weighted flow time under uncertainty using dominance and a stability box
- Stability in the combinatorial vector optimization problems
- Executing production schedules in the face of uncertainties: a review and some future directions
- Mean flow time minimization with given bounds of processing times
- Schedule execution for two-machine flow-shop with interval processing times
- Stability analysis of an optimal balance for an assembly line with fixed cycle time
- A mixed integer programming formulation for the total flow time single machine robust scheduling problem with interval data
- Sequencing with uncertain numerical data for makespan minimisation
- TWO-MACHINE FLOW-SHOP MINIMUM-LENGTH SCHEDULING WITH INTERVAL PROCESSING TIMES
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Flowshop scheduling problem to minimize total completion time with random and bounded processing times
- Stability and Regularization of Vector Problems of Integer Linear Programming
- Two-machine flowshop minimum-length scheduling problem with random and bounded processing times
- Robust Scheduling to Hedge Against Processing Time Uncertainty in Single-Stage Production
This page was built for publication: Minimizing total weighted completion time with uncertain data: a stability approach