Minimizing the maximum tardiness for a permutation flow shop problem under the constraint of sequence independent setup time
From MaRDI portal
Publication:6127631
DOI10.1051/RO/2024001MaRDI QIDQ6127631
Publication date: 14 April 2024
Published in: RAIRO - Operations Research (Search for Journal in Brave)
heuristicsmetaheuristicsMILPmaximum tardinesspermutation flow shop schedulingsequence independent setup time
Evolutionary algorithms, genetic algorithms (computational aspects) (68W50) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
This page was built for publication: Minimizing the maximum tardiness for a permutation flow shop problem under the constraint of sequence independent setup time