Selecting optimum maintenance strategy by fuzzy interactive linear assignment method
DOI10.1016/J.APM.2010.05.014zbMath1202.90096OpenAlexW2022253718MaRDI QIDQ614382
Taha Hossein Hejazi, Hossein Badri, Mahdi Bashiri
Publication date: 27 December 2010
Published in: Applied Mathematical Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.apm.2010.05.014
fuzzy programminginteractive analysislinear assignment methodmaintenance strategy selection problem (MSSP)
Linear programming (90C05) Reliability, availability, maintenance, inspection in operations research (90B25) Fuzzy and other nonstochastic uncertainty mathematical programming (90C70) Theory of organizations, manpower planning in operations research (90B70)
Related Items (8)
Cites Work
- Fuzzy hierarchical analysis
- Multiple attribute decision making. Methods and applications. A state-of- the-art survey
- The concept of a linguistic variable and its application to approximate reasoning. I
- Formulation of fuzzy linear programming problems as four-objective constrained optimization problems.
- Extensions of the TOPSIS for group decision-making under fuzzy environment
- A survey of maintenance policies of deteriorating systems
- Optimal decision making in a maintenance service operation
- Generalizing TOPSIS for fuzzy multiple-criteria group decision-making
- Maintenance policy selection for JIT production systems
This page was built for publication: Selecting optimum maintenance strategy by fuzzy interactive linear assignment method