Cycle Time Estimation of a Multiple Product Production Line: An Approach With Fuzzy and Chance-Constrained Programming
From MaRDI portal
Publication:6160199
DOI10.3138/INFOR.47.2.93OpenAlexW2160229047MaRDI QIDQ6160199
Ozhand Ganjavi, Walid Abdul-Kader, Unnamed Author
Publication date: 9 May 2023
Published in: INFOR: Information Systems and Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.3138/infor.47.2.93
fuzzy linear programmingchance constraint programmingcycle time estimationunreliable production line
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Manufacturing flow line systems: A review of models and analytical results
- Fuzzy programming and linear programming with several objective functions
- Fuzzy mathematical programming. Methods and applications
- A robust decomposition method for the analysis of production lines with unreliable machines and finite buffers
- Capacity improvement of an unreliable production line -- an analytical approach
- Chance-Constrained Programming
- A linear programming approach to capacity estimation of automated production lines with finite buffers
- Control policies for multi-product multi-stage manufacturing systems: An experimental approach
- Capacity estimation of a multi-product unreliable production line
- Metaheuristics for Hard Optimization
- Chance Constrained Programming with Joint Constraints
- Decision-Making in a Fuzzy Environment
This page was built for publication: Cycle Time Estimation of a Multiple Product Production Line: An Approach With Fuzzy and Chance-Constrained Programming