Mixed Integer Linear Programming for a Real-World Parallel Machine Scheduling Problem with Workforce and Precedence Constraints
From MaRDI portal
Publication:6165046
DOI10.1007/978-3-030-95380-5_6zbMath1528.90105OpenAlexW4285299210MaRDI QIDQ6165046
Unnamed Author, Maxence Delorme, Carlo Alberto Magni, Manuel Iori
Publication date: 31 July 2023
Published in: AIRO Springer Series (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/978-3-030-95380-5_6
mixed integer linear programmingprecedence constraintsparallel machine schedulingworkforcehydraulic components
Mixed integer programming (90C11) Linear programming (90C05) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Parallel machine scheduling with earliness--tardiness penalties and additional resource con\-straints.
- Models and matheuristics for the unrelated parallel machine scheduling problem with additional resources
- Resource-constrained project scheduling: Notation, classification, models, and methods
- A new mathematical formulation for a potash-mine shift scheduling problem with a simultaneous assignment of machines and workers
- A local search framework for industrial test laboratory scheduling
- Parallel machine scheduling with additional resources: notation, classification, models and solution methods
- Parallel machine scheduling with eligibility constraints: A composite dispatching rule to minimize total weighted tardiness
This page was built for publication: Mixed Integer Linear Programming for a Real-World Parallel Machine Scheduling Problem with Workforce and Precedence Constraints