Flow shop scheduling problems with transportation constraints revisited
From MaRDI portal
Publication:6168926
DOI10.1007/978-3-031-22105-7_2OpenAlexW4313350978MaRDI QIDQ6168926
Publication date: 10 August 2023
Published in: Lecture Notes in Computer Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/978-3-031-22105-7_2
Cites Work
- Unnamed Item
- Unnamed Item
- An improved two-machine flowshop scheduling with intermediate transportation
- Flowshop problem \(F2 \to D|v=1\), \(c\geq 1|C_{\max}\) revisited
- Two-machine flowshop scheduling with intermediate transportation under job physical space consideration
- A note on the complexity of flow shop scheduling with transportation constraints
- Complexity of problem \(TF2|v=1,c=2|C_{\max}\)
- Flowshop scheduling with interstage job transportation
- Approximability of flow shop scheduling
- Technical Note—Analysis of a Heuristic for One Machine Sequencing with Release Dates and Delivery Times
- ON AN AUTOMATED TWO-MACHINE FLOWSHOP SCHEDULING PROBLEM WITH INFINITE BUFFER
- Jackson's Rule for Single-Machine Scheduling: Making a Good Heuristic Better
- Machine scheduling with transportation considerations
- Makespan minimization for flow-shop problems with transportation times and a single robot
This page was built for publication: Flow shop scheduling problems with transportation constraints revisited