An effective population-based iterated greedy algorithm for solving the multi-AGV scheduling problem with unloading safety detection
From MaRDI portal
Publication:6179985
DOI10.1016/j.ins.2023.119949zbMath1530.90044MaRDI QIDQ6179985
Hongyan Sang, Jiazhen Zou, Leilei Meng, Wenqiang Zou, Quan-ke Pan
Publication date: 18 January 2024
Published in: Information Sciences (Search for Journal in Brave)
Mixed integer programming (90C11) Linear programming (90C05) Transportation, logistics and supply chain management (90B06) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Cites Work
- A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem
- Warehousing in the e-commerce era: a survey
- A survey of hybrid metaheuristics for the resource-constrained project scheduling problem
- Joint production and transportation scheduling in flexible manufacturing systems
- An asymmetric traveling salesman problem based matheuristic algorithm for flowshop group scheduling problem
This page was built for publication: An effective population-based iterated greedy algorithm for solving the multi-AGV scheduling problem with unloading safety detection