On the complexity of proportionate open shop and job shop problems
From MaRDI portal
Publication:6181381
DOI10.1007/s11590-023-02000-0OpenAlexW4362596021MaRDI QIDQ6181381
Djamal Rebaine, Abdennour Azerine, Mourad Boudhar
Publication date: 22 January 2024
Published in: Optimization Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s11590-023-02000-0
Cites Work
- Unnamed Item
- Unnamed Item
- The two-machine no-wait general and proportionate open shop makespan problem
- The three-machine proportionate open shop and mixed shop minimum makespan problems
- The proportionate two-machine no-wait job shop scheduling problem
- The just-in-time scheduling problem in a flow-shop scheduling system
- A note: minimizing maximum earliness on a proportionate flowshop
- Polynomial time algorithms for two special classes of the proportionate multiprocessor open shop
- Minimizing total weighted completion time in a proportionate flow shop
- Scheduling two-machine preemptive open shops to minimize total completion time
- A two-machine no-wait flow shop problem with two competing agents
- Approximation algorithms for the three-machine proportionate mixed shop scheduling
- Some positive news on the proportionate open shop problem
- Focused Scheduling in Proportionate Flowshops
- Minimizing Maximum Lateness in a Two-Machine Open Shop
- Polynomial time approximation algorithms for proportionate open‐shop scheduling
This page was built for publication: On the complexity of proportionate open shop and job shop problems