Implementing a bivariate ordering and replacement policy for deteriorating systems with two failure types
From MaRDI portal
Publication:6195047
DOI10.1111/itor.13205MaRDI QIDQ6195047
Wenjie Dong, Unnamed Author, Junliang Du, Si-Feng Liu
Publication date: 12 March 2024
Published in: International Transactions in Operational Research (Search for Journal in Brave)
Cites Work
- A closed-loop location-inventory problem with spare parts consideration
- A multi-objective approach to simultaneous determination of spare part numbers and preventive replacement times
- A number-dependent replacement policy for a system with continuous preventive maintenance and random lead times
- A condition-based replacement and spare provisioning policy for deteriorating systems with uncertain deterioration to failure
- Optimal spare ordering policy for preventive replacement under cost effectiveness criterion
- The ordering and replacement policy for the system with two types of failures
- Recursive operation time maximization model for the maintenance of power generation equipment
- Age replacement policy with lead-time for a system subject to non-homogeneous pure birth shocks
- Optimization issues in \(k\)-out-of-\(n\) systems
- Optimal repair-replacement policies for a system with two types of failures
- Joint optimization of spare parts ordering and maintenance policies for multiple identical items subject to silent failures
- Discrete-time spare ordering policy with randomized lead times and discounting
- Age Replacement with Leadtime
- Optimum replacement policies with delay
- Generalized periodic replacement policies for repairable systems subject to two types of failures
- Preventive replacement policies with products update announcements
- A repairable multi-state system with a general α-series process and an order-replacement policy
- Priority optimization and make‐to‐stock/make‐to‐order decision in multiproduct manufacturing systems
- Optimal preventive replacement last policy for a successive random works system with random lead time
- Short‐term crude oil scheduling with preventive maintenance operations: a fuzzy stochastic programming approach
This page was built for publication: Implementing a bivariate ordering and replacement policy for deteriorating systems with two failure types