Minimizing total weighted completion time in a two-machine flow shop scheduling under simple linear deterioration

From MaRDI portal
Publication:621032

DOI10.1016/j.amc.2010.11.037zbMath1230.90104OpenAlexW1982961869MaRDI QIDQ621032

Sumit K. Garg

Publication date: 2 February 2011

Published in: Applied Mathematics and Computation (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.amc.2010.11.037




Related Items

Single-machine scheduling with learning and forgetting effectsTri-criteria single machine scheduling model with release times and learning factorA time-dependent scheduling problem to minimize the sum of the total weighted tardiness among two agentsTwo-machine flow shop total tardiness scheduling problem with deteriorating jobsRobust permutation flow shop total weighted completion time problem: solution and application to the oil and gas industryPermutation flow shop scheduling with order acceptance and weighted tardinessThe strong NP-hardness of the maximum lateness minimization scheduling problem with the processing-time based aging effectSingle-machine scheduling with time-and-resource-dependent processing timesSingle-machine group scheduling with general deterioration and learning effectsSingle-machine due-window assignment problem with learning effect and deteriorating jobsGroup scheduling with deteriorating jobs to minimize the total weighted number of late jobsVariable neighborhood search for parallel machines scheduling problem with step deteriorating jobsJoint reply to the erratum and the note on ``Single machine scheduling problems under the effects of nonlinear deterioration and time-dependent learningUnrelated parallel-machine scheduling with position-dependent deteriorating jobs and resource-dependent processing timeSingle-machine scheduling with accelerating deterioration effectsSingle machine group scheduling with decreasing time-dependent processing times subject to release datesScheduling two agents with sum-of-processing-times-based deterioration on a single machineSome single-machine and flowshop scheduling problems with a non-linear deterioration functionNon-permutation flow shop scheduling with order acceptance and weighted tardinessScheduling piecewise linear deteriorating jobs to minimize makespan in a two-machine flowshopTwo-agent scheduling with position-based deteriorating jobs and learning effectsParallel machine scheduling with a deteriorating maintenance activity and total absolute differences penaltiesMinimizing Makespan in Permutation Flow Shop Scheduling with Proportional DeteriorationSingle machine group scheduling with time dependent processing times and ready timesSingle machine SLK/DIF due window assignment problem with learning effect and deteriorating jobsA branch and bound algorithm to minimize the single machine maximum tardiness problem under effects of learning and deterioration with setup timesBicriteria hierarchical optimization of two-machine flow shop scheduling problem with time-dependent deteriorating jobsSingle-machine scheduling problems with machine aging effect and an optional maintenance activityPermutation Flow Shop Problem with Shortening Job Processing TimesThe due date assignment scheduling problem with the deteriorating jobs and delivery time



Cites Work