Scheduling UET-UCT tasks: Branch-and-bound search in the priority space
From MaRDI portal
Publication:622602
DOI10.1007/S11081-009-9080-8zbMath1239.90055OpenAlexW2022544404MaRDI QIDQ622602
Ron Sorli, Bo Su, Yakov Zinder, Gaurav Singh
Publication date: 3 February 2011
Published in: Optimization and Engineering (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s11081-009-9080-8
schedulingrelease timesparallel processorsmaximum latenesspartially ordered tasksunit communication delay
Related Items (1)
Cites Work
- Unnamed Item
- Unnamed Item
- UET scheduling with unit interprocessor communication delays
- An iterative algorithm for scheduling unit-times tasks with precedence constraints to minimise the maximum lateness
- An iterative algorithm for scheduling UET tasks with due dates and release times.
- Scheduling Tasks with Nonuniform Deadlines on Two Processors
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
This page was built for publication: Scheduling UET-UCT tasks: Branch-and-bound search in the priority space