Minimizing the total completion time in single-machine scheduling with aging/deteriorating effects and deteriorating maintenance activities

From MaRDI portal
Publication:623150

DOI10.1016/j.camwa.2010.08.003zbMath1205.90141OpenAlexW1993639042MaRDI QIDQ623150

Dar-Li Yang, Suh-Jenq Yang

Publication date: 13 February 2011

Published in: Computers \& Mathematics with Applications (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.camwa.2010.08.003




Related Items (26)

Order acceptance and due-date quotation in low machine ratesSingle machine scheduling with aging effect and upper-bounded actual processing timesParallel-machine scheduling with maintenance: praising the assignment problemMakespan minimization flowshop with position dependent job processing times -- computational complexity and solution algorithmsScheduling a deteriorating maintenance activity and due-window assignmentPatient scheduling with periodic deteriorating maintenance on single medical deviceScheduling jobs and maintenance activities subject to job-dependent machine deteriorationsA time-dependent scheduling problem to minimize the sum of the total weighted tardiness among two agentsSingle-machine scheduling with deteriorating jobs and aging effects under an optional maintenance activity considerationSingle-machine scheduling and slack due-date assignment with aging effect and deteriorating maintenanceSimple matching vs linear assignment in scheduling models with positional effects: a critical reviewSingle-machine past-sequence-dependent setup times scheduling with resource allocation and learning effectOptimization of scheduling problems with deterioration effects and an optional maintenance activityThe strong NP-hardness of the maximum lateness minimization scheduling problem with the processing-time based aging effectThe computational complexity analysis of the two-processor flowshop problems with position dependent job processing timesA note on optimization in deteriorating systems using scheduling problems with the aging effect and resource allocation modelsSome single-machine and flowshop scheduling problems with a non-linear deterioration functionCOMMON DUE-WINDOW ASSIGNMENT AND SCHEDULING OF JOB-DEPENDENT DETERIORATING JOBS AND MULTIPLE DETERIORATING MAINTENANCE ACTIVITIESUnrelated parallel-machine scheduling with aging effects and multi-maintenance activitiesDue-window assignment and scheduling with multiple rate-modifying activities under the effects of deterioration and learningGenetic Algorithm for a Two-Agent Scheduling Problem with Truncated Learning ConsiderationTwo-agent scheduling with position-based deteriorating jobs and learning effectsParallel machine scheduling with a deteriorating maintenance activity and total absolute differences penaltiesSingle‐machine common flow allowance scheduling with aging effect, resource allocation, and a rate‐modifying activityUnrelated parallel-machine scheduling with deterioration effects and deteriorating multi-maintenance activities for minimizing the total completion timeSingle-machine scheduling problems with machine aging effect and an optional maintenance activity



Cites Work




This page was built for publication: Minimizing the total completion time in single-machine scheduling with aging/deteriorating effects and deteriorating maintenance activities